[edit] Aim and benefits
To recognise and encourage construction sites which are managed in an environmentally and socially considerate, responsible and accountable manner.
To focus the principal contractor and project team on the amount of energy and water consumption used during the construction process and to consider the CO2 emissions that result from the transportation of materials and waste to and from site. By monitoring and reviewing the data, this should hopefully encourage the principal contractor to identify areas where energy and water usage can be reduced and wastage minimised. By monitoring mileage and CO2 emissions from the transportation of materials and waste this may encourage them to look at the distance materials need to be transported and the number and types of deliveries required.
BRE are collating the data provided and may in future use this to establish targets.
[edit] When to consider
The requirement to monitor and record the energy and water consumption and transport of materials and waste should be included within the tender and contract documentation.
The principal contractor will need to ensure recording processes are in place when commencing on site including taking initial meter readings and establishing procedures for recording mileage and deliveries and waste collection.
[edit] Step-by-step guidance
One person from the principal contractor's organisation; such as the site foreman, manager, logistics manager or sustainability champion; should be appointed to monitor, record and report the data required.
The contractor should maintain monthly records of any energy consumption as a result of the use of construction plant, equipment (mobile and fixed) and site accommodation. The records should therefore cover all temporary electric supplies (via meter readings), fuel or hours of use for generators, fuel used on site for plant. The data will need to be converted into kWh and CO2 emissions. Details of the generators may be required to allow the figures to be converted.
The contractor will also need to keep records and meter readings for the potable water used during the construction process. This may include water bowsers or bottled water where mains supplies are not available. This should be recorded in m3.
The contractor will also need to record the transport of construction materials to site and any waste taken from site. The records should include details of the materials and waste being transported, the type of vehicle (i.e. van or HGV) and the distance travelled. This will enable the litres of fuel and CO2 emissions to be calculated using conversion rates and the figures to be divided between materials and waste transportation.
For the transport of materials, this should be recorded from the factory gate to the building site.
For the transport of waste, this should be recorded from the construction site gate to the waste disposal processing/recovery centre gate.
BREEAM requires monitoring and recording of construction materials’ transport to cover as a minimum:
- Materials used in major building elements as defined in the BREEAM issue of life cycle / environmental impact of materials, including insulation materials.
- Ground works and landscaping materials.
To ensure consistency across assessments, the information completed in the scoring and reporting tool should be restricted to this minimum data.
The record of data on transport resulting from delivery of the majority of construction materials to site should be calculated according to the type of material purchased.
- Raw materials: transport data calculated from the supplier to the site, as consideration of the previous stages is too complicated and out of the contractor’s control.
- Manufactured / bespoke products: transport data calculated from the factory assembling the module in its final form to the site.
- For small islands: no consideration of the ferry transport is required as there is no choice in selecting this transport type. Transport data will take into account the total tracking: i.e. the delivery from the factory/supplier to the first port and from the second port to the site.
[edit] Questions to ask while seeking compliance
What types of energy will be used on site i.e. generators or mains electricity. You may require the type and size of generator to enable conversions to CO2 emissions and kWh for reporting where temporary power supplies are being used.
Where a mains water supply is not in place at the start of a project, water bowsers and bottles should be recorded until the water supply is in place.
Project value to enable consumption to be reported per £100k.
[edit] Tools and resources
- Monitoring of construction site impacts - Top 10 easy win issue
- CO2 emissions can be obtained from the following link: https://www.gov.uk/government/publications/greenhouse-gas-reporting-conversion-factors-2017
- https://kb.breeam.com/section/new-construction/uk/2014-uk/management-breeam_uk_nc_2014/man03/
- https://kb.breeam.com/section/refurbishment-and-fit-out/uk-refurbishment-and-fit-out/2014-uk-refurbishment-and-fit-out/01-management-uk-rfo-2014/man-03-responsible-construction-practices/
[edit] Tips and best practice
(TG) Use of the BRE SmartWaste reporting tool including API
[edit] Typical evidence
[edit] Design stage
Contract or specification clauses or a formal letter of commitment can be used to show intent to meet the criteria at design stage.
[edit] Post construction
Records to show the energy consumption in kWh (and where relevant, litres of fuel used) as a result of the use of construction plant, equipment (mobile and fixed) and site accommodation and the total carbon dioxide emissions (kgC02/project value).
Records to show the water consumption in m3 as a result of the use of construction plant, equipment (mobile and fixed) and site accommodation.
Records to show the total distance travelled (km), total fuel consumption (litres) and total carbon dioxide emissions (kgC02) for materials delivered to site and waste from site.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Multiple Author Article 16:23, 19 Apr 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
- BREEAM Considerate construction.
- BREEAM Environmental management.
- BREEAM sustainability champion.
- BREEAM.
- Complaining about construction sites.
- Considerate Constructors Scheme CCS.
- Damage caused by construction works.
- Principal contractor.
- Site inspections.
- Site inspector.
- Site rules.
- Site waste management plan.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.